Find a Researcher
POSTECH
Education
- 2000.03 ~ 2004.02 POSTECH (박사-산업공학)
- 1998.03 ~ 2000.02 POSTECH (석사-산업공학)
- 1994.03 ~ 1998.02 POSTECH (학사-산업공학)
Career
- 2013.08 ~ 2016.06 CITY UNIVERSITY OF NEW YORK DEPT. OF BUSINESS AND ECONOMICS
- 2010.08 ~ 2013.07 RUTGERS UNIVERSITY DEPARTMENT OF SUPPLY CHAIN MANAGEMENT AND MARKETING SCIENCES
- 2007.09 ~ 2010.07 NEW YORK UNIVERSITY DEPARTMENT OF INFORMATION, OPERATION AND MANAGEMENT SCIENCS
- 2004.01 ~ 2007.08 LG전자 LG 생산기술원
Journal Papers
International
- The circular balancing problem, European Journal of Operational Research, , 321, 41-56 (2025 )
- Bicriteria twomachine flowshop scheduling approximation algorithms and their limits, Journal of Scheduling, , 27, 61-86 (2024 )
- Computational Complexity of Minimal Trap Spaces in Boolean Networks, SIAM Journal on Discrete Mathematics, , 38, 2691-2708 (2024 )
- An integrated batching problem for steel plate manufacturing with bistrand casting, International Journal of Production Research, , 61, 1-21 (2023 )
- Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time, European Journal of Operational Research, , 305, 594-607 (2023 )
- A critical review of planning and scheduling in steelmaking and continuous casting in the steel industry, Journal of the Operational Research Society, , 75, 1-35 (2023 )
- An iterated greedy matheuristic for scheduling in steelmakingcontinuous casting process, International Journal of Production Research, , 60, 623-643 (2022 )
- Bilevel integer programming on a Boolean network for discovering critical genetic alterations in cancer development and therapy, European Journal of Operational Research, , 300, 743-754 (2022 )
- Tight approximation bounds for the LPT rule applied to identical parallel machines with small jobs, Journal of Scheduling, , 25, 721-740 (2022 )
- Ideal schedules in parallel machine settings, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 290, 422-434 (2021 )
- An improved algorithm for a twostage production scheduling problem with an outsourcing option, THEORETICAL COMPUTER SCIENCE, , 876, 59-69 (2021 )
- Scheduling equal length jobs with eligibility restrictions, ANNALS OF OPERATIONS RESEARCH, , 285, 295-314 (2020 )
- Online scheduling of ordered flow shops, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 272, 50-60 (2019 )
- Towards robustness of response times minimising the maximum intercompletion time on parallel machines, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, , 57, 182-199 (2019 )
- An extended formulation of the convex recoloring problem on a tree, Mathematical Programming, , 165, 529-548 (2017 )
- A Note on Scheduling Jobs with Equal Processing Times and Inclusive Processing Set Restrictions, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, , 67, 83-86 (2016 )
- A Heuristic for Emergency Operations Scheduling with Lead Times and Tardiness Penalties, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 250, 726-736 (2016 )
- Scheduling a single machine with parallel batching to minimize makespan and total rejection cost, DISCRETE APPLIED MATHEMATICS, , 204, 150-153 (2016 )
- Improved Algorithms for Single Machine Scheduling with Release dates and Rejections, 4ORA QUARTERLY JOURNAL OF OPERATIONS RESEARCH, , 14, 41-55 (2016 )
- An improved binary search algorithm for the MultipleChoice Knapsack Problem, RAIRO Operations Research, , 50, 995-1001 (2016 )
- An extended formulation of the convex recoloring problem on a tree, Mathematical Programming, , 165, 529-548 (2016 )
- Supply chain scheduling with receiving deadlines and nonlinear penalty, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, , 66, 380-391 (2015 )
- Supply Chain Risk Mitigations with Expedited Shipping, Omega, , 57, 98-113 (2015 )
- Semionline Scheduling with GoS Eligibility Constraints, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, , 153, 204-214 (2014 )
- Fast Approximation Algorithms for Bicriteria Scheduling with Machine Assignment Costs, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 238, 54-64 (2014 )
- Two Dimensional Load Balancing, OPERATIONS RESEARCH LETTERS, , 42, 539-544 (2014 )
- TwoStage Proportionate Flexible Flow Shop to Minimize the Makespan, JOURNAL OF COMBINATORIAL OPTIMIZATION, , 25, 123-134 (2013 )
- Makespan Minimization in Online Scheduling with Machine Eligibility, ANNALS OF OPERATIONS RESEARCH, , 204, 189-222 (2013 )
- Operations Scheduling with Multiple Resources and Transportation Considerations, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, , 51, 7071-7090 (2013 )
- Semionline Scheduling Problems on a Small Number of Machines, JOURNAL OF SCHEDULING, , 16, 461-477 (2013 )
- Bicriteria Scheduling with Machine Assignment Costs, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, , 139, 321-329 (2012 )
- Container Scheduling Complexity and Algorithms, PRODUCTION AND OPERATIONS MANAGEMENT, , 21, 115-128 (2012 )
- Production Scheduling with HistoryDependent Setup Times, NAVAL RESEARCH LOGISTICS, , 59, 58-68 (2012 )
- Coordination Mechanisms for Parallel Machine Scheduling, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 220, 305-313 (2012 )
- Minimizing the Total Weighted Delivery Time in Container Transportation Scheduling, NAVAL RESEARCH LOGISTICS, , 59, 266-277 (2012 )
- Scheduling Jobs with Equal Processing Times subject to Machine Eligibility Constraints, JOURNAL OF SCHEDULING, , 14, 27-38 (2011 )
- TwoStage Production Scheduling with an Outsourcing Option, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 213, 489-497 (2011 )
- Improved Bounds for Online Scheduling with Eligibility Constraints, THEORETICAL COMPUTER SCIENCE, , 412, 5211-5224 (2011 )
- Coordination Mechanisms with Hybrid Local Policies, DISCRETE OPTIMIZATION, , 8, 513-524 (2011 )
- Flow Shops with Machine Maintenance Ordered and Proportionate Cases, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 207, 97-104 (2010 )
- Complexity of Single Machine Scheduling subject to Nonnegative Inventory Constraints, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, , 207, 605-619 (2010 )
- Makespan Minimization in Online Scheduling with Machine Eligibility, 4ORA QUARTERLY JOURNAL OF OPERATIONS RESEARCH, , 8, 331-364 (2010 )
- A Note on “An Approximation Algorithm for the Loadbalanced Semimatching Problem in Weighted Bipartite Graphs”, INFORMATION PROCESSING LETTERS, , 109, 608-610 (2009 )
- Approximation Algorithms for Multiagent Scheduling to Minimize Total Weighted Completion Time, INFORMATION PROCESSING LETTERS, , 109, 913-917 (2009 )
- Online Scheduling on Two Uniform Machines subject to Eligibility Constraints, THEORETICAL COMPUTER SCIENCE, , 410, 3975-3981 (2009 )
- A Note on Graph Balancing Problems with Restrictions, INFORMATION PROCESSING LETTERS, , 110, 24-29 (2009 )
- Online and semionline scheduling of two machines under a grade of service provision, OPERATIONS RESEARCH LETTERS, , 34, 692-696 (2006 )
- The Effect of Machine Availability on the Worstcase Performance of LPT, DISCRETE APPLIED MATHEMATICS, , 148, 49-61 (2005 )
- Parallel Machine Scheduling under a Grade of Service Provision, COMPUTERS OPERATIONS RESEARCH, , 31, 2055-2061 (2004 )
- Continuous slab caster scheduling and interval graphs, PRODUCTION PLANNING CONTROL, , 15, 495-501 (2004 )
- Continuous Slab Caster Scheduling and Interval Graphs, PRODUCTION PLANNING AND CONTROL, , 15, 495-501 (0020 )
General Journal Journal
- A Solvable Case of Emergency Supply Chain Scheduling Problem with Multistage Lead Times, Journal of Supply Chain and Operations Managemen, , 11, 30-45 (2013 )
Conference Proceedings
- Iterated Greedy Constraint Programming for Scheduling Steelmaking Continuous Casting, Lecture Notes in Computer Science including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics, 0, 0, 477-492 (2023)
- Rescheduling Problem for Heavy Cargo Logistics with Transporters
, , 0, 0, 485-493 (2022)
- An Iterated Greedy Matheuristic for Scheduling in SteelmakingContinuous Casting Process, IFIP Advances in Information and Communication Technology, 0, 0, 62-72 (2021)
- Single Machine Scheduling with regard to Inventory Constraints, PROCEEDINGS OF MODELS AND ALGORITHMS FOR PLANNING AND SCHEDULING PROBLEMS, 0, 0, 189-191 (2009)
- The Container Scheduling Problem, PROCEEDINGS OF MSOM MANUFACTURING AND SERVICE OPERATIONS MANAGEMENT ANNUAL CONFERENCE 2009, 0, 0, - (2009)
- Parallel Machine Scheduling with General Machine Shutdowns, PROCEEDINGS OF THE FOURTH ASIANPACIFIC CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 0, 0, - (2002)
IP
- 문경덕,이강복,이명호, 연안물류 중량화물 운송 선박의 배선/접안계획 수립 프로그램, 한국, C-2022-046131 (PR20)
- 이강복,이명호,문경덕, 연안 물류의 일정 계획 생성 시스템 및 방법, 한국, 10-2023-0097003 (2023)
- 이강복,이명호,문경덕, 연안물류에서의 배선/선적/양하 통합 최적 일정 계획 생성 시스템, 한국, 10-2022-0143777 (2022)
- 이강복,이명호,김병인,김현준,홍준택,김정규,방인혜, 후판 슬라브 생산 설계 장치 및 후판 슬라브 생산 설계 장치가 동작되도록 프로그래밍 된 프로그램이 저장된 컴퓨터 판독 가능한 저장매체, 한국, 10-2020-0177854 (2020)
- 이강복,이명호,김병인,김현준,홍준택,김정규,방인혜, 후판 슬라브 생산 설계 장치 및 후판 슬라브 생산 설계 장치가 동작되도록 프로그래밍 된 프로그램이 저장된 컴퓨터 판독 가능한 저장매체, 한국, 10-2020-0177854 (2020)
- 정무영,안지나,장진욱,우범영,이강복, 길이 조절이 가능한 목발, 한국, 10-1998-0005597 (1992)
Book
- Routledge Companion to Production and Operations Management, 712, LEE, K (2017 )
- Supply Chain Management and Logistics Innovative Strategies and Practical Solutions, 266, LEE, K (2015 )
Invited Talk or Presentations
- A generic development toolkit of iterative large neighborhood search for scheduling, , 0, 0, - (2024)
- An approximation algorithm for a proportionate flow shop scheduling problem with machine speeds, , 0, 0, - (2024)
- Reprogramming cell fate a survey of control problems in Boolean networks, , 0, 0, - (2024)
- Proving an Approximation Ratio by Mathematical Programming, , 0, 0, - (2024)
- Minimizing the Stay Time of Open Shop Scheduling Problems with the Unit Processing Time, , 0, 0, - (2024)
- 장기재고 소진을 위한 최적화 기반 생산 계획 수립 사례, , 0, 0, - (2024)
- Proving an Approximation Ratio by Mathematical Programming, , 0, 0, - (2024)
- Minimizing the Stay Time of Open Shop Scheduling Problems with the Unit Processing Time, , 0, 0, - (2024)
- Circular Balancing Problem, , 0, 0, - (2023)
- A Constraint Programming based Iterated Greedy Framework for Scheduling Steelmaking Continuous Casting Process, , 0, 0, - (2023)
- A bilevel integer programming approach for the synchronous attractor control problem, , 0, 0, - (2023)
- Minimizing the Makespan of a Job Shop Schedule Considering Critical Paths by Deep Reinforcement Learning based Large Neighborhood Search, , 0, 0, - (2023)
- The Circular Balancing Problem, , 0, 0, - (2023)
- Improved Iterated Greedy Constraint Programming for Steelmaking Continuous Casting, , 0, 0, - (2023)
- Analysis of Combining LPT and MULTIFIT for Identical Parallel Machine Scheduling to Minimize the Makespan, , 0, 0, - (2023)
- Minimizing Makespan for Job Shop Scheduling Problem Using Deep Learning Model Employing Critical Paths of Schedules for Large Neighborhood Search, , 0, 0, - (2023)
- Computational complexity of minimal trap spaces in Boolean networks, 대한산업공학회 춘계공동학술대회 논문집, 0, 0, 2800-2800 (2023)
- Analysis of Combining LPT and Multifit Algorithms for Identical Parallel Machine Scheduling to Minimize The Makespan, 대한산업공학회 춘계공동학술대회 논문집, 0, 0, - (2023)
- A critical review of planning and scheduling in steelmaking and continuous casting processes in the steel industry, 대한산업공학회 춘계공동학술대회 논문집, 0, 0, - (2023)
- Robust fleet management in crowdsourced lastmile delivery of online retailers The role of a mix with private vehicles, 대한산업공학회 춘계공동학술대회 논문집, 0, 0, 667-682 (2023)
- 해외 법인 생산 계획을 위한 최적화 기반자재 배분 및 운송 계획 수립, , 0, 0, - (2022)
- Robust scheduling for a disruption risk, , 0, 0, - (2022)
- Bilevel Integer Programming Approach for Solving Control Problems on Boolean Networks, , 0, 0, - (2022)
- Robust scheduling for a disruption risk, , 0, 0, - (2022)
- Bilevel Integer Programming Approach for Solving Control Problems on Boolean Networks, , 0, 0, - (2022)
- Computational Complexity of Trap Spaces in Boolean Networks, , 0, 0, - (2022)
- Workforce planning with crowdsourced logistics under regulations, , 0, 0, - (2021)
- The LPT rule for identical machines with small jobs, , 0, 0, - (2021)
- Approximation algorithms for bicriteria scheduling problems, , 0, 0, - (2021)
- Strategic location problem for synchronized lastmile delivery with relaying drones, , 0, 0, - (2021)
- Bicriteria scheduling, KSIAM 2019 Annual meeting, 0, 0, 16-17 (2019)
- A Novel Methodology for Scheduling the Steelmaking Continuous Casting Process, , 0, 0, - (2019)
- Development of Scheduling Algorithms for a Crowdsourced Delivery Persons, , 0, 0, - (2019)
- Approximation Algorithms for Bicriteria Scheduling Problems, , 0, 0, - (2019)
- Process Innovation of Synchrotron Radiator Using Time Indexed Singlemachine Scheduling, , 0, 0, - (2019)
- Strategic Location Problem for Synchronized Lastmile Delivery with Relaying Drones, , 0, 0, - (2019)
- Strategic Location Problem for Synchronized Lastmile Delivery with Relaying Drones, , 0, 0, - (2019)
- A Parallel Machine Scheduling Problem with Release Dates Equal Processing Times and Eligibility Constraints, INFORMS annual meeting 2018, 0, 0, - (2018)
- Process Innovation of Synchrotron Radiator using Time Indexed Single Machine Scheduling, , 0, 0, - (2018)
- NodesConstrained Spanning Tree problems, , 0, 0, - (2018)
- Path Partitioning Problem with Terminal Node Constraints, , 0, 0, - (2018)
- A parallel machine scheduling problem with equal processing time jobs release dates and eligibility constraints
, Proceedings of PMS 2018, 0, 0, - (2018)
- NodesConstrained Spanning Tree problems, , 0, 0, - (2018)
- Process Innovation of Synchrotron Radiator using time indexed singlemachine scheduling, , 0, 0, - (2018)
- Path partitioning problem with terminal node constraints, , 0, 0, - (2018)
- Online Scheduling of Ordered Flow Shops, 2017 대한산업공학회 추계학술대회, 0, 0, - (2017)
- An Extended Formulation of the Convex Recoloring Problem on a Tree, , 0, 0, - (2017)
- Online Scheduling of Ordered Flow Shops, INFORMS 2017, 0, 0, - (2017)
- An Improved Algorithm on Twostage Scheduling with an Outsourcing Option, 2017 POMS International Conference, 0, 0, - (2017)
- An Improved Algorithm on Twostage Scheduling with an Outsourcing Option, 2017년 대한산업공학회 춘계공동학술대회 논문집, 0, 0, - (2017)
- Ideal Schedules, INFORMS 2016, 0, 0, - (2016)
- An Improved Algorithm On Twostage Scheduling With An Outsourcing Option, INFORMS, 0, 0, - (2016)
- Ideal Schedules on Parallel Machines, , 0, 0, - (2016)
- Improved Algorithms for Single Machine Scheduling with Release Dates and Rejections, , 0, 0, - (2015)
- Scheduling a Single Batching Machine with Makespan and Total Rejection Cost Objectives, , 0, 0, - (2015)
- Two Dimensional Load balancing, , 0, 0, - (2015)
- Integer Programming Approach for Tree Partitioning into Subtrees, , 0, 0, - (2015)
- Steiner tree inequalities for clustering problems”, , 0, 0, - (2014)
- Fast approximation algorithms for bicriteria scheduling with machine assignment costs, , 0, 0, - (2014)
- Two Dimensional Load balancing, , 0, 0, - (2014)
- Supply Chain Scheduling with Renewable and Nonrenewable Resources, , 0, 0, - (2012)
- BiCriteria Scheduling on Parallel Machines with Machine Costs, , 0, 0, - (2012)
- A Solution Approach for Capacitated Multiechelon Supply Chain Network Problem, , 0, 0, - (2012)
- Production Scheduling with Historydependent Setup Times, , 0, 0, - (2011)
- Coordination Mechanisms with Hybrid Local Policies, , 0, 0, - (2011)
- Container Scheduling Problem, , 0, 0, - (2009)
- Online Scheduling on Uniform Machines Subject to Eligibility Constraints, , 0, 0, - (2009)
- Scheduling Jobs with Equal Processing Times Subject to Machine Eligibility Constraints, , 0, 0, - (2008)
- Approximation Algorithms for Multiagent Scheduling to Minimize Total Completion Time, , 0, 0, - (2008)
- The Use of Interval Graphs for the SteelMill Scheduling Problem, , 0, 0, - (2000)
- A Vector Sequencing Approach for the Steel Manufacturing Process Scheduling, , 0, 0, - (1999)
Research Activities
- , 포항공과대학교 (2016-2017)
- , 포항공과대학교 (2016-2017)
- , 포항공과대학교 (2016-2017)
- , 포항공과대학교 (2016-2017)
- , 포항공대산학협력단 (2017-2017)
- , 포항공과대학교 (2017-2018)
- , 포항공과대학교 (2017-2018)
- , 포항공과대학교 (2017-2018)
- , 포항공과대학교 (2017-2018)
- ., 재단법인한국연구재단 (2017-2018)
- , 포스코홀딩스(주) (2017-2018)
- , 포항공대산학협력단 (2017-2018)
- , 포스코홀딩스(주) (2018-2018)
- , 포항공대산학협력단 (2018-2018)
- , 포항공과대학교 (2018-2019)
- , 포항공과대학교 (2018-2019)
- , 포항공과대학교 (2018-2019)
- , 포항공과대학교 (2018-2019)
- , 재단법인한국연구재단 (2018-2019)
- ., 재단법인한국연구재단 (2018-2019)
- , 포항공대산학협력단 (2018-2040)
- , 포항공과대학교 (2018-2035)
- DEVELOPMENT OF COOPERATIVE SCHEDULING ALGORITHMS FOR A CROWDSOURCED LOGISTICS PLATFORM, 재단법인한국연구재단 (2019-2020)
- ALGORITHM DEVELOPMENT FOR OPERATIONS ON SEMICONDUCTOR MANUFACTURING LINES, 삼성전자(주) (2019-2020)
- DEVELOPMENT OF COOPERATIVE SCHEDULING ALGORITHMS FOR A CROWDSOURCED LOGISTICS PLATFORM, 재단법인한국연구재단 (2020-2021)
- , 엘지전자(주) (2020-2021)
- , 재단법인한국연구재단 (2020-2021)
- , 엘지전자(주) (2020-2020)
- , 포항공대산학협력단 (2020-2021)
- , 재단법인 정석물류학술재단 (2021-2022)
- DEVELOPMENT OF COOPERATIVE SCHEDULING ALGORITHMS FOR A CROWDSOURCED LOGISTICS PLATFORM, 재단법인한국연구재단 (2021-2022)
- , 재단법인한국연구재단 (2021-2022)
- , 엘지전자(주) (2021-2021)
- ., 엘지전자(주) (2021-2021)
- ALGORITHM DEVELOPMENT FOR GENE REGULATORY NETWORK ANALYSIS VIA OPTIMIZATION, 재단법인한국연구재단 (2022-2023)
- , 엘지전자(주) (2022-2022)
- , 재단법인한국연구재단 (2022-2023)
- , 재단법인한국연구재단 (2022-2023)
- DEVELOPMENT OF NEXT-GENERATION SCHEDULING FRAMEWORK BASED ON EXPLAINABLE DEEP REINFORCEMENT LEARNING, 재단법인한국연구재단 (2023-2024)
- , 포항공과대학교 (2023-2024)
- , 엘지전자(주) (2023-2023)
- , 재단법인한국연구재단 (2023-2023)
- THEORY AND PRACTICE OF THE PREDICTION IOF ROBUST CELLULAR REPROGRAMMING STRATEGIES FROM LOGICAL DYNAMICAL MODELS, 재단법인한국연구재단 (2024-2024)
- , 재단법인한국연구재단 (2024-2024)
- , (주)포스코디엑스 (2024-2024)
- DEVELOPMENT OF NEXT-GENERATION SCHEDULING FRAMEWORK BASED ON EXPLAINABLE DEEP REINFORCEMENT LEARNING, 재단법인한국연구재단 (2024-2025)
- , 재단법인한국연구재단 (2024-2025)
- , (주)포스코디엑스 (2024-2025)
- , 포항공과대학교 (2024-2025)
- , 엘지전자(주) (2024-2024)